Title |
Analysis of Percentage of Arcing between Pantograph and Overhead Contact Line as a Function of Duration of Arc |
Authors |
박영(Park, Young) ; 이기원(Lee, Kiwon) ; 권삼영(Kwon, Sam-Young) ; 박철민(Park, Chulmin) ; 김재광(Kim, Jae-Kwang) ; 최원석(Choi, Won Seok) |
DOI |
https://doi.org/10.5370/KIEE.2014.63.6.855 |
Keywords |
Arc detector ; Loss-of-contact ; Current collection ; Contact wire ; Pantograph |
Abstract |
Quality criteria for interaction between a pantograph and overhead contact wire is a most important requirement to assess of the performance for the current collection system. Interaction performance between pantograph and catenary system is subject to approval by the infrastructure manager when a new design and contraction of overhead contact line and pantograph are installed. Among the various performance, percentage of arcing at maximum line speed is a simple test method compared with contact force of pantograph due to direct sensing of pantagraph, calibrations, installations of train, and etc. On the other hand, percentage of arcing is need to reliable arcing detector and general requirements with accordance with EN 50317. In this paper, percentage of arcing are investigated on the function of duration of arc and proposed which is satiable of percentage of arcing. As a results, we proposed which duration of arcs are unsuitable from infrastructures point of view as performance testing for quality of current collection. |