Decentralized fuzzy observer, Discrete-time nonlinear systems, Unknown interconnection, Interconnection bound to attenuation degree ratio, Linear matrix inequality

1. Introduction

Recently, as real systems become more complex, many people have concerned about interconnected systems (1), which effectively represent the complexity of a system through the composition with subsystems and interconnection. Due to the structure of interconnected systems, some additional problems should be considered, such as high dimensionality, structural constraints of the controller, and uncertain or unknown information about the interconnections. To solve these problems, a decentralized control technique, which is separately developed for each subsystem while considering interconnections, is feasible. For this reason, decentralized control techniques for interconnected systems have been actively studied and presented so far (2-7).

Compared to a lot of research of the decentralized control, the decentralized observer design is still lacking. Most of the previous observer design techniques were also proposed by merging with the control technique (8-10), for exactly known systems (11,12), or for asymptotically stable systems (13,14). However, in the case of interconnected systems, system model is not able to be exactly known due to the uncertain or unknown interconnection. In (15), the decentralized fuzzy observer is designed for interconnected systems with unknown interconnection. However, this paper have only presented for sampled-data observing technique, but have not studied for exact decentralized observer for discrete-time interconnected systems. In (16), the decentralized fuzzy observer is designed for interconnected systems with unknown interconnection, but this paper have not considered parametric uncertainties of subsystems. Also, research is still lacking for observer design that considers observation performance for interconnected systems. Especially, the detailed study is needed for the decentralized observer design technique of discrete-time nonlinear interconnected systems with unknown interconnection and parametric uncertainties.

Motivated by the above problems of the previous techniques, in this paper, the decentralized fuzzy observer design technique is proposed for discrete-time nonlinear interconnected systems with parametric uncertainties. Based on the Takagi–Sugeno (T–S) fuzzy model, we consider that the interconnected system is composed of fuzzy subsystems and unknown interconnections. Also, for the decentralized fuzzy observer design, the interconnection bound to attenuation degree ratio (IAR) is defined and the observer design problem is stated. By using the error dynamics and the observation performance function, the sufficient condition with minimization problem is formulated for the decentralized observer design, and its condition is derived into linear matrix inequalities (LMIs). Finally, the validity and effectiveness of the proposed technique is demonstrated by the simulation example.

This paper is organized as follows: Section 2 describes the decentralized fuzzy observer and the observer design problem. The LMI conditions with minimization problem based on the error dynamics are proposed in Section 3. In Section 4, it shows an numerical example. Finally, the conclusions are given in Section 5.

Notation: The subscript $i$ denotes fuzzy rule indices, and the subscript $k$ denotes the subsystem index. The notation $(\bullet)^{T}$ denotes the transpose of the argument and the notations $\ast$ is used for the transposed element in symmetric position.

2. Preliminaries

We consider a discrete-time nonlinear interconnected system composed of $n$ Takagi-Sugeno (T-S) fuzzy subsystems, which is described for $k$th subsystem as follows:

(1)
\begin{align*} k{th} {Plant}{Ru}\le i:\\ {if} x_{k1}(t){is}\Gamma_{ki1},\:\cdots ,\:{and}x_{kw}(t){is}\Gamma_{kiw},\: \end{align*} ${THEN}\begin{cases} x_{k}(t+1)=(A_{ki}+\Delta A_{ki})x_{k}(t)+h_{k}(x(t))&\\ y_{k}(t)=C_{k}x_{k}(t)& \end{cases}$

where $x_{k}(t)\in bold{R}^{m_{k}}$ and $y_{k}(t)\in bold{R}^{l_{k}}$ are the state and output vectors of $k$th subsystem, respectively, $\Gamma_{kip}$ is a fuzzy set for $p\in I_{w}=\{1,\:2,\:\cdots ,\:w\}$, $i\in I_{r}=\{1,\:2,\:\cdots ,\:r\}$ and $k\in I_{n}=\{1,\:2,\:\cdots ,\:n\}$. and $x_{k}(t)={c o l}\left\{x_{1}(t),\:x_{2}(t),\:\cdots ,\:x_{n}(t)\right\}$ is the whole state variable of the interconnected system, Also, $A_{ki}\in bold{R}^{m_{k}\times m_{k}}$ and $C_{k}\in bold{R}^{l_{k}\times m_{k}}$ are the linear matrices of the $k$th subsystem, and the uncertain matrix $\Delta A_{ki}$ is structured as following assumption:

Assumption 1: The matrix $\Delta A_{ki}$ for parametric uncertainties is represented as follows:

$\Delta A_{ki}=D_{ki}F_{ki}(t)E_{1ki}$

where $D_{ki}$ and $E_{ki}$ are known real constant matrices of compatible dimensions, and $F_{ki}(t)$ is an unknown matrix function with Lebesgue-measurable elements and with $(F_{ki}(t))^{T}F_{ki}(t)\le I$.

Also, the interconnection function $h_{k}(x(t))$ is an unknown vector function with the following assumption:

Assumption 2: The vector function $h_{k}(x(t))$ is unknown, but satisfies the following quadratic inequality:

$\left .\left(h_{k}(x(t))\right)^{T}h_{k}(x(t))\le\alpha^{2}x(t)^{T}H_{k}^{T}H_{k}x(t)\right .$

where $\alpha >0$ is a bound scalar of the interconnection term, and $H_{k}$ is a given constant matrix with appropriate dimension.

Using center-average defuzzification, a product inference, and a singleton fuzzifier to the fuzzy IF-THEN rule eq(1), the $k$th subsystem can be inferred as follows:

(2)
$x_{k}(t+1)=\sum_{i=1}^{r}\mu_{ki}(z_{k}(t))\left(\left(A_{ki}+\Delta A_{ki}\right)x_{k}(t)+h_{k}(t)\right)$ $y_{k}(t)=C_{k}x_{k}(t)$

where

$\mu_{ki}(z_{k}(t))=\dfrac{\omega_{ki}(z_{k}(t))}{\sum_{i=1}^{r}\omega_{ki}(z_{k}(t))}$, $\omega_{ki}(z_{k}(t))=\prod_{p=1}^{q}\Gamma_{kip}(z_{kp}(t))$

in which $\Gamma_{kip}(z_{kp}(t))$ is the fuzzy membership grade of $z_{kp}(t)$ in $\Gamma_{kip}$.

Based on the $k$th subsystem eq(2), the decentralized fuzzy observer can be supposed in the following forms:

(3)
$\hat x_{k}(t+1)=\sum_{i=1}^{r}\mu_{ki}(z_{k}(t))\left(A_{ki}\hat x_{k}(t)+L_{ki}\left(y_{k}(t)-\hat y_{k}(t)\right)\right)$ $\hat y_{k}(t)=C_{k}\hat x_{k}(t)$

where $\hat x_{k}(t)$ and $\hat y_{k}(t)$ are the estimated state and output variables, respectively, and $L_{ki}$ is the observer gain matrices with appropriate dimension.

Remark 1: In this paper, the decentralized fuzzy observer is considered for the measurable premise variable case. It means that premise variable $z_{k}(t)$ can be obtained by the output variable $y_{k}(t)$, directly. If not, the decentralized fuzzy observer is designed based on the non-measurable premise variable case. However, it is out of the scope.

Now, to design the observer gain, the estimation error is considered as $e_{k}(t)=x_{k}(t)-\hat x_{k}(t)$, and its dynamics is developed as follows:

(4)
$e_{k}(t+1)=\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)+h_{k}(x(t))$

where

$\Phi_{k}(t)=\sum_{i=1}^{r}\mu_{ki}(z_{k}(t))\left(A_{ki}-L_{ki}C_{k}\right)$,

$\Delta A_{k}(t)=\sum_{i=1}^{r}\mu_{ki}(z_{k}(t))\Delta A_{ki}$.

From the fuzzy interconnected systems composed of the closed-loop subsystems eq(4), the decentralized fuzzy observer design problem can be stated as follows:

Problem 1: Find the observer gain matrix $L_{ki}$ such that

1) The estimation error dynamics eq(4) with $h_{k}(x(t))=0$ and $\Delta A_{ki}=0$ is asymptotically stable.

2) There exists the attenuation degree $\gamma\ge 0$ satisfying norm inequality $∥ e(t)∥\le\gamma ∥ x(t)∥$, where $e_{k}(t)={c o l}\left\{e_{1}(t),\:e_{2}(t),\:\cdots ,\:e_{n}(t)\right\}$ is the whole estimation error.

3) The IAR $\gamma /\alpha$ is minimized.

3. Main Results

This section shows the decentralized fuzzy observer design method based on the error dynamics eq(4) considering Problem 1. To achieve the design purpose, we define the following performance function:

Definition 1: The performance function

$J=\sum_{t=0}^{\infty}\left(e(t)^{T}e(t)-\gamma^{2}x(t)^{T}x(t)\right)$

is said to be an IAR guaranteed function. If there exists the decentralized fuzzy observer gain $L_{ki}$ such that the IAR guaranteed function satisfies $J\le 0$, we guarantee the existence of the attenuation degree $\gamma$ and the decentralized fuzzy observer satisfies norm inequality $∥ e(t)∥\le\gamma ∥ x(t)∥$.

Also, before proceeding to our main results, following lemmas have to be considered for the proof.

Lemma 1 (17): For any real matrices $X$ and $Y$ with appropriate dimensions, the following inequality is always satisfied:

$X^{T}Y+Y^{T}X\le\sigma X^{T}X+\sigma^{-1}Y^{T}Y$

where $\sigma$ is a positive constant.

Lemma 2 (18): Given some constant matrices $D$ and $E$, and some symmetric constant matrices $P_{1}$ and $P_{2}$ of appropriate dimensions, the following inequality holds:

$\left[\begin{matrix}-P_{1} & * \\ D F E & -P_{2}\end{matrix}\right]<0$

where the matrix $F$ satisfies $F^{T}F\le I$, if and only if

$\left[\begin{matrix}-P_{1} & * & * & * \\ 0 & -P_{2} & * & * \\ E & 0 & -\epsilon I & * \\ 0 & D^{T} & 0 & -\epsilon^{-1}\end{matrix}\right]<0$

for some $\epsilon >0$,

On the basis of the above lemmas, the sufficient condition for the decentralized fuzzy observer design based of the discrete-time nonlinear interconnected system composed of fuzzy subsystems eq(2) is summarized as follows.

Theorem 1: Consider the nonlinear interconnected system composed of fuzzy subsystems eq(2) and the decentralized fuzzy observer eq(3). If there exist scalar $\delta$ and $\beta$, and matrices $N_{ki}$ and $P_{k}=P_{k}^{T}>0$ such that following optimal problem with the LMI is satisfied:

(5)
$\min \delta$ subject to $$ \left[\begin{matrix} -P_{k}+I & * & * & * & * & * \\ 0 & -\delta I & * & * & * & * \\ \Phi_{k i} & 0 & -P_{k} & * & * & * \\ \Phi_{k i} & 0 & 0 & -\rho I & * & * \\ 0 & P_{k} E_{k i} & 0 & 0 & -\epsilon_{i} I & * \\ 0 & 0 & D_{k i}^{T} & D_{k i}^{T} & 0 & -\epsilon_{i}^{-1} I \end{matrix}\right]<0 $$

(6)
$P_{k}-\beta I < 0$

where

$\Phi_{ki}=P_{k}A_{ki}-N_{ki}C_{k}$, $\rho =\dfrac{\delta}{n\lambda_{H}}-\beta$,

and $\lambda_{H}$ is a maximum eigenvalue of matrices $H_{k}^{T}H_{k}$ for $k\in I_{n}$, and $\epsilon_{i}$ is a given constant scalar for $(k,\:i)\in I_{n}\times I_{n}$, then decentralized fuzzy observer eq(3) well estimates the nonlinear interconnected system eq(2), the decentralized fuzzy observer gain $L_{ki}=P_{k}^{-1}N_{ki}$, and $\delta =\gamma^{2}/(\alpha^{2}+1)$.

Proof: Consider the Lyapunov functional condidate as $V(t)=\sum_{k=1}^{n}e_{k}(t)^{T}P_{k}e_{k}(t)$ with $P_{k}=P_{k}^{T}>0$. Then, we have

(7)
$V(t+1)-V(t)+\sum_{k=1}^{n}\left(e_{k}(t)^{T}e_{k}(t)-\gamma^{2}x_{k}(t)^{T}x_{k}(t)\right)$ $=\sum_{k=1}^{n}\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)+h_{k}(x(t))\right)^{T}P_{k}$ $\times\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)+h_{k}(x(t))\right)$ $-\sum_{k=1}^{n}e_{k}(t)^{T}P_{k}e_{k}(t)+\sum_{k=1}^{n}\left(e_{k}(t)^{T}e_{k}(t)-\gamma^{2}x_{k}(t)^{T}x_{k}(t)\right)$.

Based on Lemma 1, we know that

$\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)^{T}P_{k}h_{k}(x(t))$

$+h_{k}(x(t))^{T}P_{k}\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)$

$\le\sigma^{-1}\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)^{T}P_{k}^{2}$

$\times\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)+\sigma h_{k}(x(t))^{T}h_{k}(x(t))$

with $\sigma\ge 0$. Thus, from inequality eq(7), we can obtain the followings:

(8)
$(7)\le\sum_{k=1}^{n}\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)^{T}\left(P_{k}+\sigma^{-1}P_{k}^{2}\right)$ $\times\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)$ $+\sum_{k=1}^{n}h_{k}(x(t))^{T}\left(P_{k}+\sigma I\right)h_{k}(x(t))$ $-\sum_{k=1}^{n}e_{k}(t)^{T}P_{k}e_{k}(t)$ $+\sum_{k=1}^{n}\left(e_{k}(t)^{T}e_{k}(t)-\gamma^{2}x_{k}(t)^{T}x_{k}(t)\right)$.

If there exists some scalar $\beta$ such that $P_{k}-\beta I<0$, then inequality eq(8) is represented as

(9)
$(8)\le\sum_{k=1}^{n}\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)^{T}\left(P_{k}+\sigma^{-1}P_{k}^{2}\right)$ $\times\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)$ $-\sum_{k=1}^{n}e_{k}(t)^{T}(P_{k}-I)e_{k}(t)$ $-\sum_{k=1}^{n}\lambda_{H}(\sigma +\beta)x(t)^{T}x(t)$ $+\sum_{k=1}^{n}\left((\sigma +\beta)h_{k}(x(t))^{T}h_{k}(x(t))-\gamma^{2}x_{k}(t)^{T}x_{k}(t)\right)$ $+\sum_{k=1}^{n}\lambda_{H}(\sigma +\beta)x(t)^{T}x(t)$.

From Assumption 2, we can further rewrite inequality eq(9) as

$(9)\le\sum_{k=1}^{n}\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)^{T}\left(P_{k}+\sigma^{-1}P_{k}^{2}\right)$

$\times\left(\Phi_{k}(t)e_{k}(t)+\Delta A_{k}(t)x_{k}(t)\right)$

$-\sum_{k=1}^{n}e_{k}(t)^{T}(P_{k}-I)e_{k}(t)$

$-\sum_{k=1}^{n}n\lambda_{H}(\sigma +\beta)x_{k}(t)^{T}x_{k}(t)$

$+\sum_{k=1}^{n}\left((\sigma +\beta)\lambda_{H}(\alpha^{2}+1)x(t)^{T}x(t)-\dfrac{\gamma^{2}}{n}x(t)^{T}x(t)\right)$.

Thus, the sufficient condition for $V(t+1)-V(t)$ $+\sum_{k=1}^{n}\left(e_{k}(t)^{T}e_{k}(t)-\gamma^{2}x_{k}(t)^{T}x_{k}(t)\right)<0$ can be rewritten as

(10)

${\left[\Phi_{k}(t) \quad \Delta A_{k}(t)\right]^{T}\left(P_{k}+\sigma^{-1} P_{k}^{2}\right)\left[\Phi_{k}(t) \Delta A_{k}(t)\right] }$

$+\left[\begin{matrix}-P_{k}+I & * \\ 0 & -n \lambda_{H}(\sigma+\beta) I\end{matrix}\right]<0$

(11)
$P_{k}-\beta I PREC 0$,

(12)
$(\sigma +\beta)\lambda_{H}(\alpha^{2}+1)-\dfrac{\gamma^{2}}{n}=0$.

Applying the Schur complement to eq(10) yields

(13)
$\left[\begin{matrix}-P_{k}+I & * & * & * \\ 0 & -n \lambda_{H}(\sigma+\beta) I & * & * \\ \Phi_{k}(t) & \Delta A_{k}(t) & -P_{k}^{-1} & * \\ \Phi_{k}(t) & \Delta A_{k}(t) & 0 & -\sigma P_{k}^{-2}\end{matrix}\right]<0$

By substituting eq(12) into eq(13), using Lemma 2, applying Congruence transformation with ${diag}\left\{I,\: I,\: P_{k},\: P_{k},\: I,\: I\right\}$ and denoting $P_{k}L_{ki}=N_{ki}$, $\delta =\gamma^{2}/(\alpha^{2}+1)$, and $\rho =\left(\delta /(n\lambda_{H})\right)-\beta$, we can obtain the LMI eq(5). Thus, if LMIs eq(5) and eq(6) are satisfied, it follows:

(14)
$\Delta V(t)+\sum_{k=1}^{n}\left(e_{k}(t)^{T}e_{k}(t)-\gamma^{2}x_{k}(t)^{T}x_{k}(t)\right)<0$.

Then, we get $J<0$ by summing inequality eq(14) from $t=0$ to $\infty$. Thus, LMIs eq(5) and eq(6) with optimal problem guarantees the existence $\gamma$ and minimization of IAR. Also, if $h_{k}(x(t))=0$ and $\Delta A_{ki}=0$, LMIs eq(5) is simplified as

(15)
$\left[\begin{matrix}-P_{k}+I & * & * \\ \Phi_{k i} & -P_{k}^{-1} & * \\ \Phi_{k i} & 0 & -\beta P_{k}^{-2}\end{matrix}\right]<0$

By applying the Schur complement and Congruence transformation with ${diag}\left\{I,\: P_{k}^{-1},\: P_{k}^{-1}\right\}$, the sufficient condition eq(15) is represented as

$-P_{k}+I+\left(A_{ki}-L_{ki}C_{k}\right)^{T}(P_{k}+\beta^{-1}I)\left(A_{ki}-L_{ki}C_{k}\right)PREC 0$.

Then, the above inequality guarantees the asymptotic stability of the estimation error dynamics eq(4) with $h_{k}(x(t))=0$ and $\Delta A_{ki}=0$. ■

Remark 2: To obtain LMI eq(5), it is necessary for process to dispose of uncertain matrix $\Delta A_{k}(t)$ from inequality eq(13) of Proof, Also, this process is possible by applying Lemma 2, and so is omitted here.

Remark 3: Theorem 1 presents the decentralized fuzzy observer design technique with the minimization of the IAR. It means that the minimized error can be obtained in the fixed interconnection bound, or the maximum interconnection bound can be found in the fixed attenuation degree of the estimation error.

4. Simulation

In this section, we provide simulation results to demonstrate the effectiveness of the proposed decentralized fuzzy observer design method. To simulate, we consider the nonlinear double mass-spring system (19) connected by a spring as follows:

$\ddot\zeta_{k}(t)=-f_{k}(\zeta_{k}(t))-h_{k}(\zeta_{k}(t))$

$y_{k}(t)=\zeta_{k}(t)$

where

$f_{1}(\zeta_{1}(t))=0.01\zeta_{1}(t)+0.67\zeta_{1}(t)^{3}$

$f_{2}(\zeta_{2}(t))=0.02\zeta_{2}(t)+0.63\zeta_{2}(t)^{3}$

and $h_{k}(\zeta(t))=\alpha(0.1\zeta_{k}(t)-0.1\zeta_{l}(t))$, which is the interconnection function by the constant $\alpha$, with $\zeta(t)=\left[\zeta_{1}(t)^{T} \quad \zeta_{2}(t)^{T}\right]^{T}$ for $\left\{(k,\:l)\in I_{2}| k\ne l\right\}$. Then, by choosing $x_{k}(t)=\left[\begin{matrix}{lll}x_{k 1}(t) & x_{k 2}(t)\end{matrix}\right]^{T}=\left[\begin{matrix}{ll}\zeta_{k}(t) & \dot{\zeta}_{k}(t)\end{matrix}\right]^{T}$, using the membership function $\mu_{k1}(\zeta_{k}(t))=1-\left(\zeta_{k}(t)^{2}/M_{k}^{2}\right)$ and $\mu_{k2}(\zeta_{k}(t))=\zeta_{k}(t)^{2}/M_{k}^{2}$ where $M_{k}=10$ is the maximum value of $\left |\zeta_{k}(t)\right |$, and approximate discretizaition, the discrete-time double mass-spring system can be represented by the following fuzzy subsystem:

$x_{k}(t+1)=\sum_{i=1}^{2}\mu_{ki}(z_{k}(t))\left(\left(I+A_{ki}T\right)x_{k}(t)+T h_{k}(t)\right)$

$y_{k}(t)=C_{k}x_{k}(t)$

where

$A_{11}=\left[\begin{matrix}0 & 1 \\ -0.01 & 0\end{matrix}\right]$, $A_{12}=\left[\begin{matrix} 0& 1\\-0.68& 0\end{matrix}\right]$,

$A_{21}=\left[\begin{matrix} 0& 1\\-0.02& 0\end{matrix}\right]$, $A_{22}=\left[\begin{matrix} 0& 1\\-0.65& 0\end{matrix}\right]$,

$C_{1}=C_{2}=\left[\begin{matrix} 1& 0\end{matrix}\right]$,

$H_{1}=\left[\begin{matrix} 0& 0& 0& 0\\-0.1& 0& 0.1& 0\end{matrix}\right]$, $H_{2}=\left[\begin{matrix} 0& 0& 0& 0\\0.1& 0& -0.1& 0\end{matrix}\right]$.

To use Theorem 1, we assume that a sampling period is $T=0.1$, the system matrix $A_{ki}$ has parametric uncertainties of $0.1$ and the value of the constant $\epsilon_{i}$ is $100$. by choosing the initial condition $x_{1}(0)=\left[\begin{matrix} 1& 0.1\end{matrix}\right]^{T}$, $x_{2}(0)=\left[\begin{matrix} 1& 0.1\end{matrix}\right]^{T}$ and $\hat x_{k}(0)=\left[\begin{matrix} 0& 0\end{matrix}\right]^{T}$ , and solving LMIs eq(5) and eq(6), we get the decentralized fuzzy observer gains as follows:

$L_{11}=[\begin{aligned}1.0758\\0.7572\end{aligned}]$, $L_{12}=[\begin{aligned}1.0758\\0.6903\end{aligned}]$,

$L_{21}=[\begin{aligned}1.0758\\0.7564\end{aligned}]$, $L_{22}=[\begin{aligned}1.0758\\0.6934\end{aligned}]$.

Time responses of each subsystem are shown in Fig 1-4 with $\alpha =10$. As shown in figures, we can guarantee that the proposed decentralized fuzzy observer has good estimation performance for the nonlinear interconnected system. The results of estimation error are also shown in Fig 5. To show the effectiveness of the proposed technique, we compare the performance of Theorem 1 and previous fuzzy observers without considering parametric uncertainties or interconnection by using the performance measure function

$P =\sum_{t=100}^{1000}P(t)=\sum_{t=100}^{1000}\sum_{k=1}^{n}\sum_{v=1}^{2}(x_{kv}(t)-\hat x_{kv}(t))^{2}$

in Table 1 and Fig 6. From the results of Table 1, Thus, we know that the proposed technique has better observing performance than others.

그림. 1. $x_{11}(t)$의 시간응답: 상태변수 $x_{11}(t)$ (실선), 추정상태변수 $\hat x_{11}(t)$ (파선).

Fig. 1. Time Responses of $x_{11}(t)$: original $x_{11}(t)$ (solid) and estimated $\hat x_{11}(t)$ (dashed).

../../Resources/kiee/KIEE.2022.71.2.424/fig1.png

그림. 2. $x_{12}(t)$의 시간응답: 상태변수 $x_{12}(t)$ (실선), 추정상태변수 $\hat x_{12}(t)$ (파선).

Fig. 2. Time Responses of $x_{12}(t)$: original $x_{12}(t)$ (solid) and estimated $\hat x_{12}(t)$ (dashed).

../../Resources/kiee/KIEE.2022.71.2.424/fig2.png

그림. 3. $x_{21}(t)$의 시간응답: 상태변수 $x_{21}(t)$ (실선), 추정상태변수 $\hat x_{21}(t)$ (파선).

Fig. 3. Time Responses of $x_{21}(t)$: original $x_{21}(t)$ (solid) and estimated $\hat x_{21}(t)$ (dashed).

../../Resources/kiee/KIEE.2022.71.2.424/fig3.png

그림. 4. $x_{22}(t)$의 시간응답: 상태변수 $x_{22}(t)$ (실선), 추정상태변수 $\hat x_{22}(t)$ (파선).

Fig. 4. Time Responses of $x_{22}(t)$: original $x_{22}(t)$ (solid) and estimated $\hat x_{22}(t)$ (dashed).

../../Resources/kiee/KIEE.2022.71.2.424/fig4.png

그림. 5. 추정오차 $e(t)$의 시간응답: $e_{11}(t)$ (실선), $e_{12}(t)$ (파선), $e_{21}(t)$ (쇄선), and $e_{22}(t)$ (점선).

Fig. 5. Time responses of estimation error $e(t)$: $e_{11}(t)$ (solid), $e_{12}(t)$ (dashed), $e_{21}(t)$ (dash-dotted), and $e_{22}(t)$ (dotted).

../../Resources/kiee/KIEE.2022.71.2.424/fig5.png

그림. 6. 성능평가함수 $P(t)$의 시간응답: 정리 1 (실선), 퍼지 관측기 (18) (파선), 분산 퍼지 관측기 (19) (점선).

Fig. 6. Time responses of performance measure function $P(t)$: Theorem 1 (solid), fuzzy observer (20) (dashed), and decentralized fuzzy observer (16) (dotted).

../../Resources/kiee/KIEE.2022.71.2.424/fig6.png

표 1. 성능 비교

Table 1. Performance Comparison

Performance measure function

Results

Theorem 1

0.4529

fuzzy observer (20)

0.8357

decentralized fuzzy observer (16)

0.5028

5. Conclusion

In this paper, the decentralized fuzzy observer design technique has been proposed for discrete-time nonlinear interconnected systems. For considering interconnected systems, T-S fuzzy subsystems with paramteric uncertainties and unknown interconnection have been adopted. The observer is designed to minimize IAR by using the error dynamics and the defined performance function. The sufficient condition for oberver design is provided in the LMI format. The numerical example has been shown to prove the advantage of the developed method.

Acknowledgements

이 논문은 2021년도 공주대학교 학술연구지원사업의 연구지원에 의하여 연구되었음.

This work was supperted by the research grant of the Kongju National University in 2021.

References

1 
M. Jamshidi, 1983, Large-Scale System: Modeling and Control, New York USA: ElsevierGoogle Search
2 
D. D. Siljak, A. I. Zecevic, 2005, Control of Large-Scale Systems: Beyond Decentralized Feedback, Annu. Rev. Control, Vol. 29, pp. 167-179DOI
3 
L. Bakule, 2008, Decentralized Control: An Overview, Annu. Rev. Control, Vol. 32, pp. 87-98DOI
4 
H. Wang, W. Liu, J. Qiu, P. X. Liu, 2018, Adaptive Fuzzy Decentralized Control for a Class of Strong Interconnected Nonlinear Systems with Unmodeled Dynamics, IEEE Trans. Fuzzy Syst., Vol. 26, No. 2, pp. 836-846DOI
5 
S. Sui, S. C. Tong, C. L. P. Chen, 2018, Finite-Time Filter Decentralized Control for Nonstrict-Feedback Nonlinear Large-Scale Systems, IEEE Trans. Fuzzy Syst., Vol. 26, No. 6, pp. 3289-3300DOI
6 
Z. Wang, N. Rong, H. Zang, 2019, Finite-Time Decentralized Control of IT2 T-S Fuzzy Interconnected Systems with Discontinuous Interconnections, IEEE Trans. Fuzzy Syst., Vol. 49, No. 9, pp. 3547-3556DOI
7 
H. Wang, P. X. Liu, J. Bao, X.-J. Xie, S. Li, 2020, Adaptive Neural Output-Feedback Decentralized Control for Large-Scale Nonlinear Systems with Stochastic Disturbances, IEEE Trans. Neural Netw. Learn. Syst., Vol. 31, No. 3, pp. 972-983DOI
8 
H. Kheloufi, A. Zemouche, F. Bedouhene, M. Boutayeb, 2013, On LMI Conditions to Design Observer-Based Controllers for Linear Systems with Parameter Uncertainties, Automatica, Vol. 49, pp. 3700-3704DOI
9 
L. Cao, H. Li, N. Wang, Q. Zhou, 2019, Observer-Based Event-Triggered Adaptive Decnetralized Fuzzy Control for Nonlinear Large-Scale Systems, IEEE Trans. Fuzzy Syst., Vol. 27, No. 6, pp. 1201-1214DOI
10 
V.-P. Vu, W.-J. Wang, 2021, Decentralized Observer-Based Controller Synthesis for a Large-Scale Polynomial T-S Fuzzy System with Nonlinear Interconnection Terms, IEEE Trans. Cybern, Vol. 51, No. 6, pp. 3312-3324DOI
11 
Z. Wang, Y. Shen, X. Zhang, Q. Wang, 2012, Observer Design for Discrete-Time Descriptor Systems: An LMI Approach, Automatica, Vol. 61, pp. 683-687DOI
12 
A. Zemouche, M. Boutayeb, 2013, On LMI Conditions to Design Observers for Lipschitz Nonlinear Systems, Automatica, Vol. 49, pp. 585-594DOI
13 
S. H. Tsai, 2012, A Global Exponential Fuzzy Observer Design for Time-Delay Takagi-Sugeno Uncertain Discrete Fuzzy Bilinear Systems with Disturbance, IEEE Trans. Fuzzy Syst., Vol. 20, No. 6, pp. 1063-1075DOI
14 
D.-H. Hu, Z.-J. Mao, 2020, Decentralized Observer Based Exponential Stabilization for Linear Time-Invariant Interconnected Systems, J. Physics: Conf. Series ICMAA 2020, Vol. 1519, pp. 1-5Google Search
15 
G. B. Koo, J. B. Park, Y. H. Joo, 2016, Decentralized Sampled-Data Fuzzy Observer Design for Nonlinear Interconnected Systems, IEEE Trans. Fuzzy Syst., Vol. 24, No. 3, pp. 661-674DOI
16 
G. B. Koo, 2017, Intelligent Decentralized Observer Design for Discrete-Time Nonlinear Interconnected Systems, J. Korean Inst. Intelligent Syst., Vol. 27, No. 1, pp. 15-21DOI
17 
L. Xie, 1996, Output Feedback H Control of Systems with Parameter Uncertainties, Int. J. Control, Vol. 63, No. 4, pp. 741-750DOI
18 
H. J. Lee, J. B. Park, G. Chen, 2001, Robust Fuzzy Control of Nonlinear Systems with Parametric Uncertainties, IEEE Trans. Fuzzy Syst., Vol. 9, No. 2, pp. 369-379DOI
19 
J. Yoneyama, M. Nishikawa, H. Katayama, A. Ichikawa, 2001, Design of Output Feedback Controllers for Takagi-Sugeno Fuzzy Systems, Fuzzy Sets Syst., Vol. 121, pp. 127-148DOI
20 
X.-J. Ma, Z.-Q. Sun, Y.-Y. He, 1998, Analysis and Design of Fuzzy Controller and Fuzzy Observer, IEEE Trans. Fuzzy Syst., Vol. 6, No. 1, pp. 41-51DOI

저자소개

구근범 (Geun Bum Koo)
../../Resources/kiee/KIEE.2022.71.2.424/au1.png

Geun Bum Koo received the B.S. and Ph.D. degrees in Electrical and Electronic Engineering from Yonsei University, Seoul, Korea, in 2007 and 2015, respectively.

He is currently a professor in the Division of Electrical, Electronic and Control Engineering, Korea.

His current research interests include large-scale systems, decentralized control, sampled-data control, digital redesign, nonlinear control, and fuzzy systems.