• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
Oh S. Y., H S., Park , Park Y., Cho H. Y., Song J. T., 2009, Analysis of dynamic/electric characteristic assessment system implementation technology for overhead contact lines, Fall conference of the Korean Society for Railway, pp. 1174-1179Google Search
2 
Park Y., Lee K., Park S. Y., Park J. Y., Choi W. S., 2015, Implementation of Multi-functional Type Condition Monitoring System for Railway Catenary Systems, The Transactions of the Korean Institute of Electrical Engineers, Vol. 64, No. 9, pp. 1406-1410DOI
3 
Park Y., Shin S. K., Lee K., Kim J., Kim W., 2013, Analysis of Current Collection Performance using Real-time Measurement of Current for Overhead Contact Line on the Track-side, The Transactions of the Korean Institute of Electrical Engineers, Vol. 62, No. 4, pp. 573-576DOI
4 
Park H. J., Park Y., Jung H. S., Kim H. C., 2011, A Comparative Study on the Railway Electricity Maintenance Management, Fall conference of the Korean Society for Railway, pp. 1202-1207Google Search
5 
Gao S.B, Liu Z.G., Yu L., 2017 12, Detection and Monitoring System of the Pantograph-Catenary in High-speed Railway (6C), International Conference on Power Electronic System and Application, pp. 1-7DOI
6 
Yoo K. S., Lee C. H., An G. Y., Kim J. T., 2008, Investigation of Effective Maintenance System for the Infra on the Conventional Line Prepared for the Tilting Train Service, Fall conference of the Korean Society for Railway, pp. 79-87Google Search
7 
Jang G. H., 2015, A study on the Optimization for Automatic Inspection System of Catenary, Ph.D. Thesis, Woosong University, Daejeon, Republic of Korea, 151 pagesGoogle Search
8 
Song S. G., 2008. 12, Development of Catenary Stagger and Height Measurement System using Laser, The Transactions of the Korean Institute of Electrical Engineers, Vol. 11, No. 6, pp. 569-574Google Search
9 
2016, KRTS-VE-Part1-2016(R1), Minister of Land, Infra- structure and TransportGoogle Search
10 
Park Y., Lee K., Kwon S. Y., Park C. M., Kim J. K., Choi W. S., 2014.6, Analysis of Percentage of Arcing between Pantograph and Overhead Contact Line as a Function of Duration of Arc, The Transactions of the Korean Institute of Electrical Engineers, Vol. 63, No. 6, pp. 855-859DOI
11 
Gimm Y. M., ju Y. J., Yoo J. S., Koo B. C., 2008. 11, Measurement of EMI by High-Speed Train System, Spring Conference of the Korean Society for Railway, pp. 1157-1162Google Search
12 
2010, International Standard, Railway applications-Current collection systems-Technical criteria for the interaction between pantograph and overhead line, IEC 62486:2010Google Search
13 
Park Y., Cho Y. H., Kwon S. Y., Lee K. W., You W., 2011, Development of an Arc Detector Assessment System by Loss of Contact Between Pantograph and Contact Wire in Electric Railway, The Transactions of the Korean Institute of Electrical Engineers, Vol. 60, No. 11, pp. 2171-2175DOI
14 
Na K. M., Park Y., Cho Y. H., Kwon S. Y., Lee K., You W., 2017. 04, Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line, The Transactions of the Korean Institute of Electrical Engineers, Vol. 66, No. 4, pp. 727-732DOI
15 
2002, UIC799-2002 Characteristics of a.c. overhead contact systems for high-speed lines worked at speeds of over 200 km/hGoogle Search