• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
Kwak Sang Log, Wang Jong Bae, Cho Yun Ok, Park Chan Woo, 2006, 11, A Study on Railway Safety Index for the Safety Management, Journal of the Korean society for railway, pp. 17-22Google Search
2 
Ministry of land, infrastructure, and transport , 2017, 8, Traffic safety annual report, pp. 250-254Google Search
3 
Kim Keum-Bee, Park Yunjung, Choi Sung-Mo, Lee HyunJin, Ryu Sang-Hwan, 2017, 12, Research on Development of Verification System for Transmission Data of Railway Safety Detection Device, Journal of the Korean Society For Urban Railway, Vol. 5, No. 4, pp. 975-984Google Search
4 
Lee Donghoun, Tak Sehyun, Kim Sangahm, Yeo Hwasoo, 2016, 8, A Conceptual Study of a Framework for Real- Time Railway Safety Monitoring and Control System Based on Safety Performance Monitoring Indicators, Journal of the Korean Society for Railway, Vol. 19, No. 4, pp. 526-538Google Search
5 
Park Y. J., Hwang I. T., Kim S. A., 2016, 12, Design of Integrated Monitoring System Structure for Real-time Railway Safety Monitoring and Control, Journal of The Korean Society For Urban Railway, Vol. 4, No. 4, pp. 629-636Google Search
6 
Shin Kwang-Ho, Jung Hye-Ran, Ahn Jin, 2016, 8, Data Processing Method for Real-time Safety Supervision System in Railway, Journal of the Korean Society for Railway, Vol. 19, No. 4, pp. 445-455Google Search
7 
Korean railroad corp , 2017, electrical work materials, pp. 309Google Search
8 
Ohn Jung Ghun, Moon SooYoung, 2017, 12, A Study on HAZOP by Object Model Methodology, Journal of the Korean Society For Urban Railway, Vol. 5, No. 4, pp. 1059-1065Google Search
9 
LEE Kang-Mi, BAEK Jong-Hyun, SHIN Ducko, 2010, 6, Review on HSL Safety Equipment Improvement to Train Speed Enhancement, the institute of electronics and information engineers, pp. 1796-1798Google Search
10 
LSIS Co., Ltd , 2007. 06, ATC functional description, pp. 180-183Google Search
11 
LSIS Co., Ltd , 2008, Dragging equipment detection definition file, pp. 5-10Google Search
12 
Korea Rail Network Authority , 2012.12.5, Automatic Train Stop, pp. 15-16Google Search
13 
Korea Rail Network Authority , 2012. 12, Safety equipment, pp. 14-15Google Search
14 
Korean railroad corp , 2008. 10, Basic design service of Honam High Speed Railway Construction Project No. 3 (Signal field) Construction Specification (3), pp. 297-302Google Search
15 
Korean railroad corp , 2011. 4, High Speed Rail Signal Control Equipment Maintenance Manual(Safety equipment 3-01: Function manual for obstacle and Dragging equipment detector), pp. 8-12Google Search
16 
Korea Railway Standards , 2011. 4, Track-side Subsystem-Test methods : Equipments for Signalling, pp. 1-9Google Search