• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
Ministry of Trade, Industry and Energy, 2020, Preliminary Feasibility Study Report on the Technology Development Project for Next-Generation AC/DC Hybrid Distribution Network, The Transactions of the Korean Institute of Electrical EngineersGoogle Search
2 
Sun-Keun Seo, 2020, Reliability Engineering 3rd, KyomunsaGoogle Search
3 
Mahdi Bashiri, Hossein Badri, TahaHossein Hejazi, 2011, Selecting optimum maintenance strategy by fuzzy interactive linear assignment method, Applied mathematical modelling, Vol. 35, No. 1, pp. 152-164DOI
4 
C. R. R Vishnu, V. Regikumar, 2016, Reliability based maintenance strategy selection in process plants: a case study, Procedia technology, Vol. 25, pp. 1080-1087DOI
5 
Kyoung-Soo Seo, kilShin Sung, HaeBang Sung, Jung-Hun Song, Yun-Kwon Ko, Jun-Woo Kim, 2020, Study on the Selection of Major Equipment for Urban Railway Rolling-stock CBM, Journal of the Korean Society for Railway, Vol. 23, No. 10, pp. 961-975Google Search
6 
Çağlar Karatuğ , Yasin Arslanoğlu, C.Guedes Soares, 2022, Determination of a maintenance strategy for machinery systems of autonomous ships, Ocean Engineering, Vol. 266DOI
7 
Mina Mirhosseini, 2022, Reliability based maintenance programming by a new index for electrical distribution system components ranking, Optimization and Engineering, Vol. 23, No. 4, pp. 2315-2333Google Search
8 
Evaluation Gedikli Tolga, Beyzanur Cayir Ervural, 2023, Evaluation of Maintenance Policies Using a Two-Stage Pythagorean-Based Group Decision-Making Approach, International Journal of Fuzzy Systems, pp. 1-23Google Search
9 
Soon Geun Seo, 2008, Reliability Engineering, Seoul: Kyobo BookstoreGoogle Search
10 
Ramesh Gulati, Ricky Smith, 2009, Maintenance and reliability best practices, Industrial Press IncGoogle Search
11 
John Moubray, 2001, Reliability-centered maintenance, Industrial Press IncGoogle Search
12 
José Figueira, Salvatore Greco, Matthias Ehrgott, 2005, Multiple criteria decision analysis: state of the art surveysGoogle Search
13 
Seong-Hyun Kang, Byung-Seok Park, 2022, Construction and Demonstration Plan for a ±35kV Class MVDC System, Journal of the Korean Institute of Power Electronics, Vol. 27, No. 5, pp. 44-49Google Search
14 
O. Pavlovic, H. -D. Ehrich, 2010, Model Checking PLC Software Written in Function Block Diagram,, 2010 Third International Conference on Software Testing, Verification and Validation, Paris, France, pp. 439-448DOI
15 
Dalen T. Chiang, Shun-Chen Niu, 1981, Reliability of consecutive-k-out-of-n: F system, IEEE transactions on Reliability, Vol. 1, No. 30, pp. 87-89DOI
16 
Pedro J. Martinez Lacanina, Antonio de la Villa Jaén, Jose L., Martinez Ramos, 2006, A new technique for short-term reliability assessment of transmission and distribution networks, 2006 International Conference on Probabilistic Methods Applied to Power Systems, IEEEDOI
17 
Jizhe Dong, Peng Chen, 2015, Reliability Evaluation of Multi-terminals VSC-HVDC System, Journal of Electrical Systems, Vol. 11Google Search
18 
Y. Hakim, A. Pharmatrisanti, 2012, Transmission asset management in PLN P3B Jawa Bali, 2012 IEEE International Conference on Condition Monitoring and DiagnosisDOI
19 
Chuanyue Li, 2015, The DC grid reliability and cost evaluation with Zhoushan five-terminal HVDC case study, 2015 50th International universities power engineering conference (UPEC)DOI
20 
Ming Chen, 2019, Study on surface charge Accumulation characteristics of resin impregnated paper wall bushing core under positive DC voltage, Energies, Vol. 12, No. 23DOI
21 
José Guillermo Bedoya Hernández, Juan José Mora Flórez, Alejandro Garcés Ruíz, 2008, Determinación de los modos de fala de transformadores convertidores en sistemas HVDC, Scientia et technica, Vol. 2, No. 39DOI
22 
P. Bokoro, I. Jandrell, 2016, Failure analysis of metal oxide arresters under harmonic distortion, SAIEE Africa Research Journal, Vol. 107, No. 3, pp. 167-176DOI
23 
Brad Retterath, Ali A. Chowdhury, Subrahmanyam S. Venkata, 2004, Decoupled substation reliability assessment, 2004 International Conference on Probabilistic Methods Applied to Power SystemsGoogle Search
24 
Kaigui Xie, Bo Hu, Chanan Singh, 2015, Reliability evaluation of double 12-pulse ultra HVDC transmission systems, IEEE transactions on power delivery, Vol. 31, No. 1, pp. 210-218DOI
25 
Ø. Rui, 2011, Design, operation and availability analysis of a multi-terminal HVDC grid-A case study of a possible Offshore Grid in the Norwegian Sea, 2011 IEEE Trondheim PowerTechDOI
26 
Lin Cheng, 2014, Reliability analysis of HTS cable systems, IEEE Transactions on Power Delivery, Vol. 30, No. 3, pp. 1251-1259DOI
27 
A. Saltelli, M. Ratto, T. Andres, F. Campolongo, J. Cariboni, D. Gatelli, M. Saisana, S Tarantola, 2008, Global Sensitivity Analysis. The Primer, John Wiley and SonsGoogle Search
28 
Joong-Woo Shin, 2022, Adaptive Reliability-Centered Maintenance Scheduling for VSC-HVDC using Hybrid Failure Rate Model, Ph.D. diss, Soongsil UniversityGoogle Search
29 
Jang-Hoon Jeong, 2021, Feasibility Study Report for the Next-Generation AC/DC Hybrid Distribution Network Technology Development Project, Science and Technology Policy InstituteGoogle Search
30 
Waloddi Weibull, 1951, A Statistical Distribution Function of Wide Applicability, ASME Journal of Applied MechanicsGoogle Search
31 
Ting Wang, 2020, Mixed Weibull distribution model of DC protection system based on entropy weight method, Journal of Physics: Conference Series, Vol. 1633, No. 1, pp. IOP PublishingDOI
32 
H. Sh Solari, H. Sh, B. Majidi, M. Moazzami, 2019, Optimal Estimation of Weibull Distribution Parameters in order to Provide Preventive-Corrective Maintenance Program for Power Transformers, Iranian Journal of Electrical & Electronic Engineering, Vol. 15, No. 4Google Search
33 
C. M. Chu, 2010, Extraction of time-varying failure rates on power distribution system equipment considering failure modes and regional effects, International Journal of Electrical Power & Energy Systems, Vol. 32, No. 6, pp. 721-727DOI
34 
Sri Sudadiyo, 2023, Weibull model for RUL estimation at RSG- GAS reactor implemented on PA01-AP01 secondary pump, Kerntechnik, Vol. 88, No. 2, pp. 194-202DOI